Cabin Work 2
Last modified on October 9th, 2021 / Web editing done by Brian Davis.
Top,...................... Page 01,... Page 02

The metal bracket of this southern most (the closest in this picture) post was sheared off, and displaced to the left.
.
Top,... Page 01,... Page 02,... Page 03

Close-up of the southern-most post base.  To the right is the now sheered-off metal support tube.
.
Top,... Page 02,... Page 03,... Page 04

New peers and adjustable turnbuckles installed.
.
Top,... Page 03,... Page 04,... Page 05

Close-up of pier and turnbuckle.
.
Top,... Page 04,... Page 05,... Page 06

Only black reflectors were available at Jack's.  The rust-through can be seen in the old reflector.
The size of this large reflector is 9&3/8" OD by 8&1/8" ID.  The opening is 8¼" diameter.
The three small reflectors are chrome finish and are in excellent condition, so were not replaced.
.
Top,... Page 05,... Page 06,................

Grace exhausted after these daunting projects.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.